Our Projects

New Doha International Airport Project (Cup 01)

Client  : M/s Hamad International Airport, Qatar
Consultant  : M/s Parsons Transportation Group, Qatar
Contractor  : M/s ADCC JV, Qatar
Project  : New Doha International Airport Project – CUP 1 Qatar 

To Monitor all the Auto Transfer Switch status of all Substations serving Passenger Terminals, Emiri Terminal, Mosque etc., of Hamad International Airport and based on the signal, Generators sequence and Load shedding to be done by PMCS

New Doha International Airport (Cup 02)

Client  : M/s New Doha International Airport Steering Committee
Consultant  : M/s Bechtel Overseas Incorporated, Qatar
Contractor  : M/s CAT International Qatar W.L.L, Qatar
Project  : New Doha International Airport Project – CUP 2, Qatar

Central Utility Plant supplies Chilled Water to the Terminals and Other Airport facilities. PMCS Monitors and controls 11kV Substations, 6.6kV Switchgears, Generators, Chillers, Transformers, LV Panels, Distributions Boards and completely monitors the energy conservation through Power Quality Meters and protections through Protection Relays. The PMCS will automatically operate the complete plants in Normal Power mode and Emergency Power Mode, Load shedding to other facilities.

New Doha International Airport Project (Cup 03)

Client  : M/s New Doha International Airport Steering Committee
Consultant  : M/s Bechtel Overseas Incorporated, Qatar
Contractor  : M/s CAT International Qatar W.L.L, Qatar
Project  : New Doha International Airport Project – CUP 3, Qatar

Power Management and Control System for Central Utility Plant 3. Central Utility Plant supplies Chilled Water to the Terminals and Other Airport facilities. PMCS Monitors and controls 11kV Substations, 6.6kV Switchgears, Generators, Chillers, Transformers, LV Panels, and Distributions Boards and completely monitors energy conservation through Power Quality Meters and protections through Protection Relays. The PMCS will automatically operate the complete plants in Normal Power mode and Emergency Power Mode, Load shedding to other facilities.

New Doha International Airport (Cup 04)

Client  : M/s New Doha International Airport Steering Committee
Consultant  : M/s Bechtel Overseas Incorporated, Qatar
Contractor  : M/s CAT International Qatar W.L.L, Qatar
Project  : New Doha International Airport Project – CUP 4, Qatar

Power Management and Control System for Central Utility Plant 4. Central Utility Plant supplies Chilled Water to the Terminals and Other Airport facilities. PMCS Monitors and controls 11kV Substations, 6.6kV Switchgears, Generators, Chillers, Transformers, LV Panels, and Distributions Boards and completely monitors energy conservation through Power Quality Meters and protections through Protection Relays. The PMCS will automatically operate the complete plants in Normal Power mode and Emergency Power Mode, Load shedding to other facilities. 

Dust Suppression System for Solidification, UAE

Client  : M/s TAKREER, UAE
Contractor  : M/s IMECO, UAE
Project  : Dust Suppression System for Solidification, UAE
DSS to work in automatic mode only. DSS will do Automatic Startup, Production & Controlled shutdown of the system. To Monitor and automate Process Water System, Cement System, Sand System, Waste Water System, Exhaust System, Mixer, Mould Conveying System and to provide the Trend Curves.

Process Automation of 12, 000 m3 / Day Sewage Treatment Plant, Qatar

Client  : M/s Ashghal, Doha, Qatar
Consultant  : M/s Belhasa Engineering, Doha, Qatar
Contractor  : M/s Gulf Switchgears Co, Doha.
Project  : Process Automation of 12, 000 m3 / Day Sewage Treatment Plant, Qatar
Sewage Water Treatment Plant purifies sewage water at different stages of operation. . There are 3 zones in this Plant, Where pre-treatment is done in Zone 1. And in Zone 2, Aeration process of treated water is carried out. In Zone3, the Clarifier process is carried out. Along with many other process , the Disinfection process is to remove the infected water through Chlorination using dosing Pumps. Finally, Odor Control Unit removes any odor is exist in the water.

Substation Control & Management System, UAE

Client  : M/s ADWEA, UAE
Contractor  : M/s Hyundai Engineering Construction Co., UAE
Project  : Substation Control & Management System, UAE

Substation Monitoring and Control System for Substations, 6.6kV Switchgears, Generators, Chillers, Transformers, LV Panels, and Distributions Boards and completely monitors energy conservation through Power Quality Meters and Protections through Protection Relays.

Kiln Burner control for cement plant

Client  : M/s  Tamilnadu Petro Products Ltd, Chennai.
Project  :  Kiln Burner control for cement plant

Provide a high performance process control system based on Control Logic series AB( Rockwell Automation PLC system and fully integrated Editor Version  SCADA. The SCADA system to be integrated with PLC system which Monitors & Controls the entire Plant Process. The system consist of 1000 IO’s overall consisting DI, DO, AI & AO.

Umm Al Quwain Secondary Technical School Project, UAE

Client  : M/s Abu Dhabi Education Council, UAE
Consultant  : M/s Elite Design & Engineering Consultancy, UAE
Contractor  : M/s Z General Contracting Company.
Project  : Umm Al Quwain Secondary Technical School Project, UAE

Intelligent Building Automation System which to be integrated with CCTV, LCS, ACS, and Electrical System and to maintain the Air Flow / Ventilation throughout the Main building of the School. Lighting Control of the school is done based on the preset time Schedule. Security Systems like CCTV and Access Control system for continuous monitor through LCD & Android applications and recording.

Samad Project at Mussanah, Oman

Client  : M/s Sultanate of Oman, Ministry of Defence
Consultant  : M/s NJP Engineering Consultancy LLC, Oman
Contractor  : M/s Al Badi Trading & Contracting Est., Oman
Project  : Samad Project at Mussanah, Oman

Design, Supply, Testing, and Execution of Panels for AHUs, FCUs, Chillers, Pumps, Fans, 3rd Party Interfaces along with Workstation.

Jabreen Project at Mussanah, Oman

Client  : M/s Sultanate of Oman, Ministry of Defence
Consultant  : M/s NJP Engineering Consultancy LLC, Oman
Contractor  : M/s Al Badi Trading & Contracting Est., Oman
Project  : Jabreen Project at Mussanah, Oman

Design, Supply, Testing and Execution of Panels for AHUs, FCUs, Chillers, Pumps, Fan’s, 3rd Party Interfaces  along with Workstation .

Oil Filtration Panel for New 400/220/33kV GRIDSTATION AT ICAD Site, UAE

Client  : M/s TRANSCO, UAE
Contractor  : M/s Toshiba Corporation, UAE
Project  : Oil Filtration Panel for New 400/220/33kV GRIDSTATION AT ICAD Site, UAE

Step-Down Power Grid substation at ICAD site supplies the Oil Filtration Field where Oil purification process takes place. Heavy Duty Power Receptacles, 3 phase, 4 wires, 400V shall be provided in suitable location for maintenance purposes for the indoor and outdoor substation areas. Power Panel consist of the Power Injector (Plug & Socket) which feds the Cabinet where Oil Filtration process occurs.

Al Arish Loading Station, Yemen

Client  : M/s Ministry of Water & Environment Local and Sanitation Corp., Yemen
Contractor  : M/s VA Tech Wabag, India
Project  : Al Arish Loading Station, Yemen

Loading Station for Sewage Water Treatment  Plant

Al Salam PS, Yemen

Client  : M/s Ministry of Water & Environment Local and Sanitation Corp., Yemen
Contractor  : M/s VA Tech Wabag, India
Project  : Al Salam  PS, Yemen

Pumping Station for Sewage Water Treatment

New 400/220/132kV GRIDSTATION AT ICAD Site

Client  : M/s TRANSCO, UAE
Contractor  : M/s Toshiba Corporation, UAE
Project  : New 400/220/132kV GRIDSTATION AT ICAD Site

The Fiber optic cable used at site is for the secure and fast mode of data transfer between Transco and ADI. The transfer of data was between Relay room, SCMS room and Telecom room. 2 Fiber Optic Splice Box is used at two ends used to terminate Fiber Optic Cable. ST, FSMA and SC type connectors are used for the termination of cable. LT Cubicle, communication cable, RS-232C act as communication cable between the Telecom and SCMS station where LT cubicle are used at both sides. The relay station consists of FSMA Time synchro FOC, Transceiver. The SCMS station consists of 33kV SCMS server.